Overview

This project covered electrical system upgrade work at the Ergo Insurance (Thailand) PCL headquarters in Ergo Tower. The scope included dismantling legacy MCCB panels and relocating main power feeds into a new Load Center to improve system efficiency and safety. Our team managed the entire on-site operation to completion within a single day, minimizing disruption to office operations. Post-installation testing and commissioning confirmed the system was fully operational and ready for normal use.

Key Features

  • Dismantling of 4 legacy MCCB panels
  • Relocation of 4 main power cable sets into the new Load Center
  • One-day on-site execution to minimize area downtime
  • Testing and commissioning with 100% operational readiness

Project Details

Client
Ergo Insurance (Thailand) Public Company Limited
Location
Ergo Tower, Bangkok, Thailand